Detailed mining lamp installation procedures and precautions

Mining lamp installation steps:
The first step: pre-installed hook at install the mining lamp position,(hook can be match with the hook rings to work, in addition to ensure the hook can be carrying capacity to more than 30kg)。
The Second step: put the hook ring of mining lamp into hook,thus the mining lamp lifting up by the hook rings。
The third step: the power line from the construction site the mining line has connected to the power supply line of the lamp, accordance with the “brown–L””blue—-N”” yellow — ground” principle connected,and to finish the work that water proof and insulated。
The fourth step: switch on the power, to confirm whether the normal work of industrial and mining lamp;
The fifth step: after confirm the lights without error, install is finish.
Note of mining lamp installation:

1 installation of mining lamps or replacement parts, must first disconnect the power supply;

2 connect the power, should pay attention to the input voltage and the mining lamp adapter, power line connected, must make relevant waterproof and insulation processing.